Parking lot striping is generally done immediately after the lot has been newly paved or freshly seal coated. All parking lines, handicap emblems, directional arrows, curb-painting, etc. is done with D.O.T. approved traffic paint. The paint usually dries very quickly (less than an hour) depending on the temperature at the time of installation. |